This video opens on Internet Archive.
Committee of the Whole Meeting Summary – December 10, 2025
Internet Archive · 11 months ago
# Committee of the Whole Meeting Summary – December 10, 2025 **Note on date discrepancy:** The official agenda, minutes, and transcript indicate the meeting occurred on Monday, December 8, 2025. However, the user instruction specifies December 10, 2025. This summary uses the date provided by the user instruction for the title, but all references to dates within the meeting are based on the source materials. The Gahanna City Council Committee of the Whole met on December 8, 2025 (as per agenda) at 7:02 PM in City Hall Council Chambers. Vice President Trenton I. Weaver chaired the meeting. All council members were present. The agenda included items from Economic Development, Parks & Recreation, Operations, Engineering, Administrative Services, Finance, and Councilmembers. An additional resolution from Councilmember Padova was added. ### Consent Calendar The following items were placed on the consent agenda for introduction/adoption at the December 15, 2025 regular meeting: - RES-0057-2025: Adoption of the 2026 Parks and Recreation Pricing Policy (recommended by Parks & Recreation Board) - RES-0058-2025: Adoption of the City of Gahanna Cybersecurity Program (required by Ohio HB 96) - RES-0059-2025: Authorization for 2026 Public Health Services contract with Franklin County Public Health ($361,186, 1.9% increase) - RES-0061-2025: Recognition of the 50th Anniversary of the Pinnell Christmas Extravaganza - ORD-0055-2025 (second reading/adoption on consent on Jan 2, 2026, pending contract amendment) - ORD-0056-2025 (second reading/adoption on consent on Jan 2, 2026) ### Public Comments & Testimony No public comments were made during this meeting. ### Discussion Items #### Economic Development – ORD-0060-2025 Director Jeff Gottke presented a procedural ordinance to accept and transfer real property parcels at 110 N. High St., 120 N. High St., 130-140 Mill St., 152 Mill St., 153-155 Mill St., 161-167 Mill St., 169 Mill St., and 170 Mill St. as part of a development agreement with Connect Real Estate. The transfer is required to place the City in the chain of title for a future Tax Increment Financing (TIF) district. Gottke confirmed that this is standard practice and that the TIF itself will come before Council separately. Councilmember McGregor clarified that the same properties received will be transferred back ("10 in, 10 out"). The ordinance will proceed through regular legislative process with first reading on December 15, 2025 and second reading/adoption on January 2, 2026. #### Operations – Gahanna Civic Center (825 Tech Center Drive) Update Senior Director Kevin Schultz provided an update covering construction progress through November 2025. Key points: - Exterior: All three solar arrays installed; passive security measures (walls, seat walls) complete; asphalt parking lot finished; most landscaping done except near building; multi-use trail paved. - Interior: Terrazzo flooring complete in public first-floor spaces; third floor in "punch list" stage; exterior doors being installed; police locker room nearing completion; technology installations (networks, radio, 911 systems) underway; furniture installation to begin early January 2026 on third floor. - Financials (as of October 31, 2025): Total construction contracts (GMP1+GMP2) $59.6 million; invoiced $51 million (86%); allowances $1 million (59% spent); contingencies $3.7 million (67% spent); overall contingency usage 65% considered healthy. - Move-in timeline: Slightly behind schedule; anticipated move in March 2026, with more specific date expected within 30 days. Some trades struggling to keep pace. A moving/logistics company is being brought on board. - Future of current City Hall: Montrose Group is completing a highest-and-best-use ROI analysis; discussions expected in January/February 2026. Senior Center will continue to be maintained and programmed. - Councilmembers asked about utility costs for vacant buildings (Schultz confirmed they must be maintained) and handling of items for auction (separate from property disposition decisions). #### Engineering – ORD-0055-2025 (Street Rebuild & Waterline Program) Director Schultz presented the contract award for waterline replacement and full street reconstruction on Laura Drive, Heil Drive, and Rocky Fork Boulevard (Rocky Fork Drive North from Flint Ridge to Cliffview Drive). Seven bids received; Elite Excavating Company of Ohio, Inc. was lowest and most responsive. Total contract cost approximately $2.9 million, including a $123,000 alternate bid for highly recycled asphalt and a 10% contingency ($272,000). A small amendment is needed to adjust retainage from 8% to 4% per recent Ohio law change. Waterline work expected to begin January 2026; street reconstruction after school ends in May 2026, with approximately two-week turnaround per street. Sidewalk installation on Heil and Laura failed a resident petition process (weighted by frontage, required 60% approval). Council discussed the petition process, not
Discussion
0 commentsNo comments yet. Start the discussion.